Two Rivers Bridge Closed this Week.

Two Rivers Bridge (October - 2012)
Two Rivers Bridge (October - 2012)

According to InArkansas, the Two Rivers Bridge connecting the Arkansas River Trail to Two Rivers Park will be closed starting at 7 a.m. Tuesday the 3rd until 6 p.m. Friday the 6th, to do repairs on the lighting system. It appears that the repairs are to the decorative lights and not navigational or lights for trail visibility. The unfortunate part is that the weather forecast is for seasonally warm temperatures and no rain which makes the bridge very popular.

Arkansas Outside Gear Store
See also  Ozark Society Selects Letters To Dan: A Philosophical Guide to the Ozarks as Sassafras Award Winner

One Response

  1. Hopefully they slow the lights down instead of the rapid flashing/changing that they have them set on now. Slow color shifting looks a lot classier than the seizure inducing mode.

Leave a Reply

Your email address will not be published. Required fields are marked *